Irak / Baiji LDN Pipeline Project

1 Unit of Three-Legged Dredging barge was dispatched to the work site.
During the Project;
• 230 Meter Tigris River Open Canal Excavation.
• Back fillings of pipe lines.;

DENTA SCOPE

  • Underwater Trench Excavation,
  • Pipe Installing,
  • Underwater Works.

EMPLOYER : VEMAK CONS. INC