Mersin/Karaduvar AAT Plant Outfall Project

The 2105 m long 1800 mm diameter GRP sea discharge of Mersin Karaduvar Waste Water Treatment Facility was built by as as the approved subcontractor of MESKI. During the project, 44,000 m³ excavation material, (Max. depth  -15 Meter ) underwater services and two long floating excavator Dredging barges with boom for the production of back filling, a sea crane to lower the pipes into the sea and a floating barge with a flap barn for back filling were used. The production was completed as turn key.

Entire manufactures made were completed on turnkey delivery basis by our company, certified sub-contractor of Mersin Water and Sewerage Administration.

YOU CAN BROWSE OUR PDF CATALOGUE WHICH FEATURES EXTENSIVE INFORMATION ABOUT THE PROJECT

DENTA SCOPE

Onshore/Offshore Underwater Excavation Works,
Bedding,
Moving pipe at the land and the sea.
Underwater workmanship,
Back fillings,
Gabions of (1200) be placed over the pipe,
Diffusers – 15 meters depth installation.

EMPLOYER : SİSTEM CONS. INC