Buski Stabilization Pool Discharge Project

Bursa/Buski ( Bursa water and sewers Management ) 110.000 m3 mud in waste water reclamation facilities has been scanned by Cutter/Suction dredging barge which were designed for this work.

The mud is being dug with spinning blades and being absorbed and pumped to 300 meters by 2 X 400 m3 45 kv KSB centrifuge mud pumps.

DENTA SCOPE

  • The manufacture of the dredger,
  • The establishment and operation of the dredge pump,
  • Laying the discharge pipe,
  • The completion at the period of the study.

EMPLOYER : SISTEM CONS. INC