Eren Port 6000 m3 Rock Dredging Project
The company attended the Dredging works performed for Eren Holding Catalagzı Port, Power plant 3rd unit pipe line construction and worked for 2.5 months..
At -10 meters, enrockment and local rocks were broken and scanned and loaded onto the dump ship provided by the employer.
DENTA SCOPE
- The mobilization of the dredger,
- Breaking of rock using with hydraulic hammers,
- Barge loading the dumps of broken rock.