GRP & HDPE
PIPELINES
We are at your disposal with our experienced
team and qualified equipment.
TRM/KGF PROJECT
1900 m Ø 3700 mm,
1300 m Ø 3100 mm GRP Pipelines.
TACE PROJECT
Turkmenistan/Kıyanlı 2 X Ø1200 mm
HDPE Pipelines Project completed.
WE PUSH LIMITS
Turkmenistan/Garabogaz 3700 mm
Pipelines Projects
Turkmenistan
TACE Project
Turkmenistan/Kiyanlı 1200 mm HDPE
Pipeline Project Completed
img_2044

WELCOME TO DENTA DREDGING LTD...

Denta Dredging LTD, has been serving with its specialized staff for 21 years in marine construction and dredging industry.

WHO WE ARE...

Our experience has been growing with the projects we have undertaken in Azerbaijan, Turkmenistan and Iraq.

WHAT DO WE DO...

Our Company whose main field is marine dredging and underwater construction has been carrying out bottom dredging works in sea, lake, rivers, and seaport and fısherman shelters by using mechanic and hydraulic tools since 2001.

PDF Catalog

You Can Download Our PDF Catalog

…23 YEARS IN MARINE WORKS…

We have been working continuously for 21 years, from the simplest projects to major projects.

cimg2947

Dredging Operations

Deepening of ground structures such as sand, mud and clay in seas, lakes and creeks using dredging method with Backhoe/dredger or Cutter/Suction.Dredging by cracking solid surface terrains such as stone, rock or slate with underwater hydraulic breakers.

img_0047

Pipeline Operations

With operations which are executed by our professional underwater crew, we carry out operations like constructing underwater, charge/discharge pipes and cathodic protection manufacturing by following the blueprint, surfacing the sunken.

b1-1

Reclamation Projects

Our Geotextile Methods : We are constructing Wick-Drain installation underwater, Soil-Tain Tubes , Com-Trac and, Ring-Trac support with our special design (Lay-Barge) barges and vibro-driver installation towers for terrains with low bearing capacity.

Our Environmental Policy

Mauris rhoncus pretium porttitor. Cras scelerisque commodo odio. Phasellus dolor enim, faucibus egestas scelerisque hendrerit, aliquet sed lorem.

Our Certifications

Our working standards

OHSAS 18001 – 2007

ISO 9001 – 2008

ISO 14001 – 2004

REFERANCES

Some of our projects which we have successfully accomplished with our employers, which we have been honored to work together in the underwater

You Can Watch Our Presentation Movie

OUR NEWS IN BRIEF

  • Our company will construct water intake and extraction pipelines, through sea, of Factory of Fertilizer which has been being constructed in Turkmenistan/Garaboğaz by GAP Construction Corporation.  (KGF-SWIO Project) Total length of 3700 Mm-diameter suction line and 3100 mm-diameter GRP extraction is 3254 meters.

    GAP CONS. INC. Denta Dredging LTD
  • For Gas to Gasoline plant that has been being constructed in Turkmenistan/Kıyanlı region, our Company has undertaken all workmanship, as turn-key, for water-intake bory lines through the sea. Within this scope, it has been started to dispatch, from Turkey, all the floating equipments required for all the welding, excavation, mounting and filling works of 2300 meter 1200 mm-diameter HDPE pipe lines to be installed into the sea.

    RONESANS HOLDING INC Denta Dredging LTD
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text.

Start typing and press Enter to search